Stellar: Asset Management

Replacing three platforms with one self-service product at Spectral.

Role

Product designer, the only designer on Asset Management

Company

Spectral, energy tech

Platform

Web

Timeline

About 3 months

IMAGE NEEDED: Hero

Stellar Live View, full width. The dark UI with the 3D wind farm render. Export the frame from Figma at 2x, about 1600 x 900.

Contents

Summary

THE BET

Most support tickets were about the UI. If I fixed navigation and structure, clients would not need Spectral in the middle.

WHAT CHANGED

Clients found their own data and reports. Fewer tickets came in, and the control team got time back to build and test new features.

Spectral ran its asset management on three separate platforms. Clients could not use them on their own, so every question became a request to Spectral. I redesigned them into one product, STELLAR, with a new information structure, Live View, Explore and Reports.

Snapshot

My role

First designer at Spectral and the only designer on Asset Management. Research to final UI.

Team

Tech lead, 2 front-end devs, 4 back-end devs, head of product and CEO. No PM on Asset Management. Spectralโ€™s control team and energy consultants were my domain experts.

Users

Asset managers and asset owners at Spectralโ€™s clients.

Constraints

Fixed scope, about 3 months, no product analytics, no record of why legacy features existed.

IMAGE NEEDED: Before and after

Left: one legacy platform screen (Re-flex or Wind-flex). Right: the new Live View. Use the same kind of site on both sides if you can.

Framing the problem

One problem with three layers. Each layer has a different owner and a different test.

The business

Spectral was a service company that wanted to become a product company. It had a few large clients and wanted to onboard smaller ones. That only works if clients can use the product without Spectral in the middle.

The users

The product was used mostly inside Spectral. Control engineers served client requests. Energy consultants managed assets for clients. Clients came through client managers because they could not use the product themselves. Two client roles needed serving:

  • Asset owners are the buyers. They want status and reports.

  • Asset managers run assets day to day. They want to see them and, later, control them.

The product

The platforms grew from client requests and consultant suggestions. Nobody had written down why features existed. Navigation was weak. The same stats, graphs and tables repeated for every site, wind farm and battery.

Wind and solar sites ran on two platforms, Re-flex and Wind-flex. Microgrids ran on a third, SCP. When a client wanted data the platform did not show, an engineer built a Grafana dashboard by hand and sent the link.

IMAGE NEEDED: Three legacy platforms

Re-flex, Wind-flex and SCP side by side, plus one hand-built Grafana dashboard. Use the About frame from your FigJam.

The domain made it harder

Renewable energy is vast and complex compared to conventional energy. It is new for the grid operator. Regulation keeps changing. Large streams of data have to become something a person can use.

The questions I worked from

  1. How might we enable asset managers and asset owners to see relevant information about their sites?

  2. How might we enable asset owners to see the status of their sites?

  3. How might we reduce support tickets from owners asking for the status of their sites?

What success meant

The goal was to unify Spectralโ€™s offering into one product, with a structure that suits future products, a new visual design and room to scale. I picked two measures:

Measure

How I would know

Self-service

Fewer support tickets, counted monthly in Zendesk. The type of ticket also shifts from โ€œhelp me find itโ€ to โ€œhelp me do moreโ€.

Learning for energy market integration

Qualitative insight from users and clients. This became a research channel.

What I did not have. Product analytics. Support tickets were the only usage signal, and I knew that from the start.

Constraints and trade-offs

  • Fixed scope. The focus was workflows and information structure, not new features.

  • About 3 months, with no PM and 2 front-end devs.

  • No documentation or record of why legacy features were added.

  • No product analytics.

  • Real users were hard to reach. These are large B2B organizations, so a client manager acted as the go-between.

  • A domain I had to learn first, with regulation that keeps changing.

What I decided, and why

Decision

Why

Feature parity first

Keeps the bet clean. If tickets drop, navigation did it.

Explore a larger vision in wireframes, but do not build it

Shows where the product can go without breaking scope.

Defer new client feature requests. โ€œWe can do this, but not right now.โ€

Release first with a scalable navigation, then build features on top of it. A client request is a signal, not a spec.

Remove repeated data and features nobody could explain

The audit found the same data on several pages, and features with no known purpose.

Design for licensing, do not build it

The tenancy model needed room for it.

What my audit of the old product flagged

  • Financial reports were missing for some sites, with no explanation.

  • Not all data depended on date and time, yet date controls applied to everything.

  • The last refresh time was not shown.

  • Live data could not stay active once a date range was selected.

  • Data repeated between the Dashboard and Asset Monitor.

  • Notifications and personalization had no known purpose. A โ€œWhatโ€™s newโ€ page existed because one client asked for it.

Approach

Four steps, but not a straight line. Each step loops back to the one before it. I moved forward when I had enough, and went back when I did not.

IMAGE NEEDED: Process

The process diagram from your FigJam: Explore, Define, Conceptualize, Visual design, with the loop-back notes.

1. Explore

My rule was if I do not understand, nobody will. I did not know the energy domain, so I started there.

  • Who I met: energy consultants, control engineers, the CEO and customer success. Plus the internal wiki and online research.

  • What I looked at: the energy domain, the business, the products and the users.

  • Legacy review: I went through the screens of each platform, plus the Grafana dashboards the control team had built.

Area

What I found

Energy domain

Vast and complex compared to conventional energy. New for the grid operator. Regulation keeps changing.

Business

A service company moving to a product-first model. A few large clients. Wants smaller ones.

Products

Built from client requests and consultant suggestions. No record of why features were added. Navigation and structure problems.

Users

Mostly internal. Control engineers served client requests. Energy consultants managed assets.

IMAGE NEEDED: Legacy review

Two or three legacy screens with your notes on them, plus one Grafana dashboard.

2. Define: picking my battles

Four decisions, one per branch of my FigJam:

  1. Feature parity for the asset management products. Fixed scope, focused on workflows and information structure.

  2. Information architecture. Decide what to keep and what to remove. Build one common structure for Re-flex, Wind-flex and SCP.

  3. Potential users. Asset owners and asset management teams.

  4. Business. Move to a product model and a new team structure.

Then I used a prioritization matrix to rank the work against the questions above.

The widget audit. For every number, gauge and graph in the old product, I answered three questions: What does it mean? Why does the user need it? Does it need historical data? Where I could not answer, I marked the cell red and asked the control team. For example:

  • When does an asset become unavailable?

  • Are OPC warnings a sign that assets are not working?

  • Should we call it โ€œWorking turbinesโ€ or โ€œOperational turbinesโ€?

  • Is this โ€œCurtailable powerโ€?

This is how I replaced โ€œthe old product has itโ€ with โ€œthe user needs it, and here is why.โ€

IMAGE NEEDED: Widget audit

The widget audit table from your FigJam with the red cells visible. Add the prioritization matrix next to it if it fits.

3. Conceptualize: the drawing board

  • Wireframes, not visuals. I wanted only functional feedback, no opinions about colors.

  • Layout options based on the defined information. Data visualization chosen by need, not by habit.

  • Technical feasibility checked with the tech lead and devs.

  • A larger vision. The concepts were not limited to feature parity. They showed what the product could become.

I asked the control team to review the wireframes: Is this how you want to see the data?

IMAGE NEEDED: Wireframes

Three wireframes: the home screen (โ€œWelcome to Stellarโ€), the site view with Live Site, Total Site Data and Reports tabs, and one version of the monthly imbalance report page.

4. Visual design: simple, clean, modern

A dark, data-first interface that puts the numbers first. Icons come from Material icons, extended with Pictogrammers. Decisions at this stage were about the readability of live data, not decoration.

The new information architecture

This is the structure everything else hangs on. Data is organized by what you are looking at.

  • Site overview, then Wind farm, Solar plant and Battery, then down to a turbine or string.

  • Each level has the same kinds of views: Overview, Power, Status, Availability, Curtailment and Environmental.

  • Live View shows what is happening now, with a 3D view. Explore shows what happened, for deeper analysis.

  • Market data sits where it belongs: balance delta and imbalance settlement prices, and battery FCR bids.

The old product repeated stats, graphs and tables per site, wind farm and battery with no context. The new structure shows each piece of data once, under the thing it describes.

IMAGE NEEDED: Information architecture

The new IA diagram (site, wind farm, solar plant, battery, turbine or string, with the views). Put the old repeated Stats, Graphs and Tables audit screens next to it as a before and after.

Working with others

Who

What we did together

Control team

They taught me the domain. They reviewed concepts and wireframes. Their answers turned the widget audit from guesses into definitions.

Energy consultants

Explained how assets are managed for clients and what clients really ask for.

Tech lead and back-end devs

Shaped the tenancy model and checked feasibility. Kept the UI and the data structure matching.

Front-end devs (2)

Built it with me.

Head of product and CEO

Agreed the scope: no new features during the redesign.

Customer success and client managers

Go-between for real users I could not meet.

How I got people on board

  • Before any CEO meeting, I aligned the control team, head of product and back-end devs first. By the time we met, nobody was surprised.

  • I treated a client request as a signal, not a spec. A user need is what is best for the user and the company.

  • I did not say no to features. I said โ€œwe can do this, but not right now.โ€ That kept requests alive without breaking scope.

Where I pushed back

New features asked for by clients were a strong pull. I pushed back. The plan was to release the product first with a scalable navigation, then build features on top of it. Releasing a clean base also kept the bet readable.

What shipped

The launch version. Function first, built around the three jobs clients used to ask Spectral for.

  1. A tenancy model people can follow. Asset (a turbine), Site (a wind farm), Portfolio (wind farms in a region), Organization (a client) and Admin (Spectralโ€™s control team and third-party asset managers). Built with the back-end team.

  2. Live View. A site picker, a tree with a status dot for each turbine, a status table, power and setpoint cards, a setpoint versus power chart and a 3D render with wind speed, direction and temperature. Users choose the refresh: Refresh now, 2s, 10s or 30s. In my early flow it was a fixed 1s. I made it selectable to find out whether users changed it before settling on one default.

  3. Explore. Time range presets and a resolution of 30 seconds, 15 minutes or 1 hour. 15 minutes is the standard in the energy sector. Compare against another date and download the data.

  4. Reports. Financial and Monthly Imbalance reports, for one site or several.

IMAGE NEEDED: Live View

Live View at full size, with the 3D wind farm render.

IMAGE NEEDED: Refresh control

Live View with the refresh control open (Refresh now, 2s, 10s, 30s).

IMAGE NEEDED: Explore

Explore with a time range and resolution set, and one frame comparing two dates.

IMAGE NEEDED: Reports

The Reports page, Financial and Monthly Imbalance.

IMAGE NEEDED: Tenancy model

The tenancy diagram: Asset, Site, Portfolio, Organization, Admin.

The three jobs this replaced

Job

Before

After

Check an assetโ€™s status

Raise a ticket. The control team answers.

Open Live View. Go from portfolio to site to asset.

Analyze what happened

Ask the control team for a data pull, or get a Grafana link.

Pick a range and resolution in Explore. Compare. Download.

Get a report

Request it from the control team.

Open Reports and download.

Impact

Users could now use the product without needing support. Fewer tickets came in, and the kind of ticket changed. I have no product analytics, so tickets were my signal.

Before

After

Data requests that only the control team could fulfil

Mostly stopped.

โ€œWhere is my dataโ€ and asset status tickets

Stopped coming in. Asset managers found their own reports.

Requests to fix the UI

Requests for new functionality, such as controlling the asset.

What changed for the company

  1. Self-service. Clients found their own data and reports. The control team got time back to build and test new features instead of servicing requests.

  2. A base to scale on. Scalability was designed in, so features were easier to add. The new requests became the next products: Curtailment scheduling, so clients can set schedules on an asset, and a dashboard to place FCR bids.

  3. Service to product. Requests were now about needs, not usability fixes. Spectral moved toward a product organization.

  • Engineering could structure work better.

  • The control team resolved issues faster.

  • Everyone used one platform for asset management. The Grafana dashboards ended after launch.

Context, not proof. ABN AMROโ€™s Sustainable Impact Fund later invested in Spectral. Iโ€™m not claiming the redesign caused it.

IMAGE NEEDED: Follow-on products

Screens of the two products that came out of the new requests: Curtailment scheduling and the FCR bid dashboard.

Let's work together

If you're building something complex and need a designer who'll get into the weeds with you, let's talk.

Email me at

Copy component

Copied

itsmohamedansari@gmail.com

Let's work together

If you're building something complex and need a designer who'll get into the weeds with you, let's talk.

Email me at

Copy component

Copied

itsmohamedansari@gmail.com

Let's work together

If you're building something complex and need a designer who'll get into the weeds with you, let's talk.

Copy component

Copied

itsmohamedansari@gmail.com